Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
You can create a Production order from?
Question 1:
You can create a Production order from?
A.
Directly from Stock Requirement List
B.
Using Planned Order
C.
Both of these
D.
None
These questions are from this test. Would you like to take a practice test?
SAP SCM Quiz 2 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
Material Requirement Planning can be performed at?
Functions related to supply chain management in SAP ERP system are all of the following except
In SAP system, Production data structures generated from SAP R/3 master data contains the following data?
Which of the following is not a key activity of an operations manager?
A Supply Chain is a process of linking?
Which of the following doesn’t represent an issue Material Requirement Planning element?
ERP Stands for
You can create a Production order from?
All of the following are measures (metrics) developed by the Supply Chain Council to measure performance of a supply chain except
For XYZ, Inc. sales during the last 60 days were $1,800,000, accounts receivables at the end of the month were $300,000, and inventory value at the end of the month equaled $630,000. Cost of the sales is 70% of the total sales. Accounts payable at the end of the month was $252,000. Therefore, cash-to-cash cycle (in days) is equal to
Some other questions you may be interested in
What is the default number of points to destroy a ship in a space battle on Star Wars: Battlefront 2?
Choose the correct order for player points bonuses in Star Wars: Battlefront from least to greatest.
The two levels on Kashyyyk on Star Wars: Battlefront 1 are Islands and Docks.
On the Star Wars: Battlefront game, which of these is among the non-player characters of the game?
Who controls the AT-ATs on Hoth in Star Wars: Battlefront?
Warchief Thrall is the leader of which clan?