Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
To use SAP F&R, which of the following master data should exists in the system?
Question 1:
To use SAP F&R, which of the following master data should exists in the system?
A.
Product
B.
Supply network
C.
Calendar
D.
Procurement cycle
E.
All of these
These questions are from this test. Would you like to take a practice test?
SAP SCM Quiz 3 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
Which of the following transaction code is used to create Planned Independent Requirement PIR?
You can create a Production order from?
Material master contains data related to scheduling, capacity planning and production costing?
Which of the following doesn’t represent an issue Material Requirement Planning element?
Material Requirement Planning can be performed at?
SCM stands for?
When you use Planning strategy 10, which of the following is correct?
When material is produced as per Production order and goods is placed at storage location, which of the following is correct??
Which of the following is first step involved in Production Order confirmation?
To use SAP F&R, which of the following master data should exists in the system?
Some other questions you may be interested in
Id rather die like a man, than live like a coward
Will there ever be peace?
Bury me smilin
Cant sleep cause all the dirt make my heart hurt
Now heres a story bout a woman with dreams
Now aint nobody tell us it was fair