Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
Material master contains data related to scheduling, capacity planning and production costing?
Question 1:
Material master contains data related to scheduling, capacity planning and production costing?
A.
True
B.
False
C.
All of these
D.
None of these
These questions are from this test. Would you like to take a practice test?
SAP SCM Quiz 3 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
Which of the following transaction code is used to create Planned Independent Requirement PIR?
You can create a Production order from?
Material master contains data related to scheduling, capacity planning and production costing?
Which of the following doesn’t represent an issue Material Requirement Planning element?
Material Requirement Planning can be performed at?
SCM stands for?
When you use Planning strategy 10, which of the following is correct?
When material is produced as per Production order and goods is placed at storage location, which of the following is correct??
Which of the following is first step involved in Production Order confirmation?
To use SAP F&R, which of the following master data should exists in the system?
Some other questions you may be interested in
Hailed as a trash masterpiece and directed by Vincente Minelli, Two Weeks In Another Town is the story about how hard it is to make quality films in Hollywood. Who played the main character, Jack Andrus?
This film written and directed by Preston Sturgess deals with a director of escapist films, who goes looking for escape.
Which ancient language is often referred to as the the mother of all languages?
Which of these commercial organisations was founded in 1947?
In which European city is the headquarters of Interpol located?
In which layer of the atmosphere do artificial satellites operate?