Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
Who performed this song included in the album Kill Em All?
Question 1:
Who performed this song included in the album Kill Em All?
A.
Metallica
B.
Slayer
C.
Megadeth
D.
Iron Maiden
These questions are from this test. Would you like to take a practice test?
Trivial Practice Quiz music - Test 147 | Englishfreetest.com
30 minutes
15 questions
Do test
Some questions from the same exam
What type of wine did Deana Carter sing about in 1996?
Guess the band or the singer performing the song on the sound clip.
Which band or singer performs this song that contains a reference to the Watergate scandal?
Guess the band or the singer performing this 1999 single.
Name the psychedelic/heavy metal band who performs the song on the sound clip.
Guess singer who performs this classic rock song.
Which band recorded this Grammy Award-winning song?
Who performed this song included in the album Kill Em All?
Which band performed this Grammy Award-winning song?
Which band released this song on their album Blood Sugar Sex Magik?
Billy Idol was born in Middlesex, England on this date.
What is the birth name of pop/rock artist Billy Idol, who achieved massive success in the 1980s?
Billy Idols first stint as a guitar player was with which punk band?
What punk rock band was formed in 1976 by Billy Idol, Tony James and Terry Chimes?
Billy Idol played in the movie The Doors, directed by Oliver Stone.
Some other questions you may be interested in
Susan can type 10 pages in 5 minutes. Mary can type 5 pages in 10 minutes. Working together,
how many pages can they type in 30 minutes?
Two men, A and B, run a 4 km race on a circular course of 1/4 km. If their speeds are in the ratio of 5:4,
how often doe's the winner pass the other?
A can do piece of work in 30 days while B alone can do it in 40 days.
In how many days can A and B working together do it?
Adam can do a job in 15 days, Eve can do the same job in 20 days. If they work together for 4 days on this job.
What fraction of job is incomplete?
A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they
can finish the work in 2 days. B can do the work alone in
Anand finishes a work in 7 days, Bittu finishes the same job in 8 days and Chandu in 6 days. They take turns to finish the work. Anand on the first day, Bittu on the second and Chandu on the third day and then Anand again and so on.
On which day will the work get over?