Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
What is the T Code for creating work schedule?
Question 1:
What is the T Code for creating work schedule?
A.
PT01
B.
PT02
C.
PT03
D.
PT04
These questions are from this test. Would you like to take a practice test?
SAP HR Quiz 2 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
A is the key for which object type?
Which organizational units make up the Personnel structure?
Communication between time recording systems and HR time management takes place via standard interface?
Elements of the enterprise structure?
Select the structure which is NOT used in SAP
Select the component which is used as selection criteria for evaluations and used in authorization checks UK.
Out of the following which is NOT subtype of the Infotype 0006?
What is the T Code for creating work schedule?
Communication between time recording systems and HR time management takes place via standard interface?
What is assigned to the payroll status info type 0003) to personnel numbers with errors?
Some other questions you may be interested in
Marry: “I don’t like onion!”
Tracy: “I’m driving to work now.”
Mother: “I’ve cooked pasta.”
Kate: “I’ll do it tomorrow.”
Paul: “When does the train arrive?”
Bob: “Don’t go there alone.”