Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Indonesian
Login
Signup
Contact
Login
Home
Parallel Processing in case of Client Copy is
Question 1:
Parallel Processing in case of Client Copy is
A.
Performed in Local Client Copy
B.
Performed in Client Transport
C.
Performed when you want to do other client copy in parallel
D.
Not recommended by SAP
These questions are from this test. Would you like to take a practice test?
SAP Basis Quiz 4 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
The Customizing Client should have the option in SCC4 as
Which of the following statements are correct in regards to modifications
Parallel Processing in case of Client Copy is
Which layer in a SAP client server architecture processes ABAP programs?
Which program is used for taking backup of SAP system when connected to DataProtector backup tool?
Given and R/3 Central Instance with all services installed, using Instance ID01, and having the SAP ID of C11. What is the name of the directory where the work process trace files are written (for Windows NT replace the / with ")?
What is the transaction used to import SAP-provided support packages into your system
When creating a logon group for Logon Load Balancing, which of the following CANNOT be specified?
Select INVALID type of instance
Tcode to import the client
Some other questions you may be interested in
Harrison Ford did his own stunts for Indiana Jones and the Crystal Skull.
What was the name of the villain in the 2008 film The Incredible Hulk?
Who plays Alfred in the record breaking 2008 movie, The Dark Knight?
What signature object does Hellboy always have in his mouth in 2008s Hellboy II: The Golden Army?
Hancock is the first movie in which Will Smith plays a superhero.
When the producers of the movie Snakes on a Plane wanted to change the title, actor Samuel L. Jackson protested, saying the only reason he took the job was because of the title.