Have any questions?
[email protected]
English
Vietnamese
French
Spanish
Korean
Japanese
Thai
Chinese
Login
Signup
Contact
Login
Home
Before releasing a change request, the following tasks should be completed
Question 1:
Before releasing a change request, the following tasks should be completed
A.
All tasks must have previously been released
B.
SE09 needs to be installed
C.
TMs has to be configured
D.
All tasks must have previously been tested
These questions are from this test. Would you like to take a practice test?
SAP Basis Quiz 3 | Englishfreetest.com
20 minutes
10 questions
Do test
Some questions from the same exam
Which of the following client should be used to configure STMS?
What is the Trusted RFC connection type to specify connection between ABAP systems?
A Transport request consist of which of the following files?
Which of the following are known as wildcard characters?
Which of the following represents a standard format of a Transport request?
Which of the following transport routes, Transport layers are not required?
Which of the following can be used to delete multiple jobs in SAP system?
WHICH OF THE FOLLOWING TRANSACTION CODE USED TO RELEASE A TASK?
Development classes contains ____________?
Before releasing a change request, the following tasks should be completed
Some other questions you may be interested in
What American rapper was born on October 4, 1989 in New York City?
The first full-length episode of this popular TV sitcom premiered on Fox on December 17, 1989.
Who named the Cambrian period?
The Cambrian period lasted from 490 million years ago to 443 million years ago.
What term refers to the raise of biodiversity that occurred during the Cambrian period?
This animal, which lived during the early Cambrian period, is possibly one of the first fish to evolve.