Transcript:
W: Mr. Jackson. I’m calling regarding the ongoing construction of your franchise store on Main Street. Due to the rainstorm last week, we’ve fallen a little behind schedule. I’m afraid we won’t have it done by the due date stipulated on the contract after all.
M: Oh, that’s something that I didn’t expect to happen. The problem is that we already arranged our grand opening ceremony on the date specified in our contract.
W: I’m sorry to hear that. Aside from the bad weather, we needed to order more marble to case the walls with, but the supplier said it was currently out of stock. I think we need at least a couple of extra weeks.
M: Then, why don’t you send me an e-mail attached with the revised schedule right away? I have to let my supervisor know about the schedule change so that we can reschedule the grand opening in an appropriate way.